IPS enhanced the 5kV and 480V electrical switchgear and MCCs at raw and finished water pump stations. The finished water electrical building expanded to house the new gear. We upgraded three 250HP aeration and filter backwash blowers, enhanced accessories, and added flow meters at treatment basins. A new 12-ton chlorine scrubber was added to the disinfection building. In the same building, we replaced 5kV and 480V MCCs, upgraded four PLCs facility-wide, and laid around 3,600 linear feet of new electrical duct banks and conductors. Successful startup, testing, and commissioning of all plant improvements were completed.